C Series

WC 316.jpg

Transperth C-series train between Burswood and Stadium stations, February 2023. The train was undergoing testing before commencing service. Photo: Steelkamp, Wikimedia Commons.

Road numbers:

CEA1127–68, CEB6127–68, CEC2127–68, CED3127–68, CEE4127–68, CEF5127–68

 

Set numbers:

127–168

 

Operator:

Transperth

 

Gauge:

1067 mm

 

Year of entry into service:

2024

 

Number built:

246 (Not all in service yet)

 

Manufacturer:

Alstom

 

Manufacturing location:

Bellevue, WA

 

Weight:

 

Length:

24.0 m

 

Seats:

65

Perth’s C Series electric trains commenced service in April 2024. A Railcar Manufacturing and Assembly Facility was opened at Bellevue for the trains to be manufactured by French company, Alstom. Orders were placed for 41 train sets, to be delivered over a period of up to ten years, and will replace the A Set trains. They operate as six-carriage sets and began running on the Mandurah and Yanchep Lines. Their maximum speed in general service is 130 km/h.